Walks
- Cernusco sul Naviglio
Naviglio della Martesana
The Martesana Canal, begun in 1457, promoted trade and transport, divided Cernusco, was very busy, then superseded by tramways and roads.
Let us now climb onto the swing bridge over the Martesana Canal. Work on the
construction of the canal began after Francesco Sforza's decree in 1457.
The “Naviglio Piccolo” was intended for irrigation, to power mills and to
connect the Adda to Milan. The project physically divided the town in two and isolated the
church of Santa Maria from the centre.
Navigation began in 1471, but the canal did not reach the inner circle of
Milan until the end of the century. It was used by passengers travelling to the city, but also by
traders who went to neighbouring villages to sell their products in the
markets. Food, wood, straw and hay, and building materials were transported to Milan,
while fabrics, manufactured goods and precious salt were transported in the opposite direction. The Naviglio was
very busy and there was a regular public service. There were also pirates
who attacked the boats. From 1777, with the opening of the Paderno canal, it was
possible to reach Milan from Lecco without changing boats: it took about twenty
hours, and ten days for the return journey.
The tramway on the Padana (inaugurated in 1878) and the development of the road network
spelled the end of the canal from a commercial point of view.
Some legends of the Naviglio Martesana canal can be found at the link
https://prolococernusco.wordpress.com/altre-leggende-del-territorio/
Gallery
Useful information about the place
Address: ponte girevole via Lungo Naviglio, 24, 20063 Cernusco sul Naviglio (Milano), Italia
Nearby places